Task C: Rehabilitation and Replacement Program

Appendix A

Planning Model Community Group Patterns For Average and Maximum Day

Appendix B

New Population Projection for Each TAZ and Community

Appendix C

Peaking Factor for Each Community

Appendix D

TAZ and Community Average and Maximum Day Demand by Decade

Appendix E

GA Optimization Study of Detroit Comprehensive Water Master Plan – Final Report

Appendix F

Design Data Summary for Current Mode of Operation Plan and Hybrid Plan

Appendix G

Recommended Transmission Pipe Upgrades

Appendix H

C-Factor Projections


 

Task B: Planning Criteria Appendix A-H

Task C: Rehabilitation and Replacement Program Appendix A-H

Task G: Temporary Flow Monitoring Appendix A-H

© 2018 Great Lakes Water Authority. All rights reserved.